Proven Track Record
From billion-dollar transit programs to emergency response, QRSE delivers results across construction management, environmental support, and cutting-edge technology implementation — on time, every time.

HART CE&II — Airport Guideway & Stations
Owner's representative role on the Airport Guideway and Stations Design-Build program. Managed inspection team across all Airport Stations, coordinated with HECO, Spectrum, Hawaiian Telkom, DPP, and DTS. Maintained 5,000+ design sheet as-built plan set. Mitigated millions in delay claims.

HART Construction Phase III
West Oahu/Farrington Highway Guideway, Kamehameha Highway Guideway segments. ~63,000 combined billable hours across HART CE&II AGS and Phase III. This work was QRSE's breakthrough — growing from 2 to 50+ employees.

Hurricane Lane Emergency Response, Hilo
Geological conditions including slope sloughing and subterranean water flows at Makea Stream. Revised soil nails to hollow bar anchors. Gained USACE Regulatory permission under emergency timeline. All work completed on schedule.

Kapolei Interchange Complex, Phase 2
Federally funded project constructing new on/off ramps, roadway modifications, post-tensioned concrete elevated bridge/overpass, and connections to Farrington Highway. Includes concrete paving, pre-cast girders, asphalt paving, highway lighting and traffic signals.

H-1 Widening — Ola Lane to Likelike Off-Ramp
Widening of Hawaii's most critical interstate corridor. Managed complex traffic operations including multi-prime IDIQ coordination across approximately 3 miles of urban freeway.

H-1 Resurfacing — Miller to Kapiolani
Night work with 8:30pm–6:00am closures. Multi-prime IDIQ coordination across Honolulu's most critical corridor.

E-Construction Implementation, Statewide
Statewide deployment of e-project platform for HDOT. 104+ contracts, FACSware migration, ACC configuration, Power BI dashboards. Centralized knowledge management system for staff training and project tracking.

PHMSA Natural Gas Distribution Grant
Created the entire NEPA compliance framework for PHMSA's first-ever billion-dollar construction grant program. Built procedures, training materials, grantee guidance, and a review process. Completed 37 environmental assessments in the first year.

Farrington Highway — Makaha Bridges No. 3 & 3A
Environmentally sensitive coastal site at Makaha Beach. Required SWPPP, BMP plans, and environmental permit approvals. Managed complex bridge replacement adjacent to active shoreline.
Kuhio Highway Emergency Slope Stabilization, Hanalei Hills
Emergency slope stabilization on Kauai's north shore. Critical route preservation for communities dependent on single-access highway.

Waimea Canyon Drive / Kokee Road Improvements Phase 2B
Road improvement program on Kauai including safety upgrades and pavement rehabilitation along scenic corridor.

HDOT Kauai Open Ended: Hanalei Bridge
Open-ended construction management support for the historic Hanalei Bridge on Kauai's north shore — a critical single-lane bridge serving communities along the North Shore.

J&J Hilo Combined Support Maintenance Shop (CSMS)
Construction management for the Combined Support Maintenance Shop facility in Hilo, supporting HDOT's ongoing highway maintenance operations on the Big Island.

Kapolei Harborside (KPD)
Construction management for harbor development project at Kapolei, supporting Hawaii's port infrastructure and intermodal transportation capacity.

Wahiawa Pedestrian Bridge, Whitmore Village
Construction management for a pedestrian bridge connecting Whitmore Village to Wahiawa, improving community connectivity and pedestrian safety.

Emergency Repair (ER) Manual Development
Development of the HDOT Emergency Repair manual, establishing standardized procedures for FHWA Emergency Relief fund documentation and project management.

Design Management Program
Program management and design oversight services for HDOT, ensuring quality and compliance across the department's active design programs.

Kapolei Interchange Complex, Phase 3
Phase 3 of the Kapolei Interchange Complex — continuing construction of freeway access modifications and interchange improvements in the District of Ewa, Island of Oahu.

NEPA Assignment Program Support
Providing environmental support for IDOT's NEPA Assignment program, ensuring compliance with federal environmental review requirements for state-managed projects.
Cesspool Conversion Program
Cesspool-to-septic conversion designs using QRSE's AI-assisted platform. PE-stamped, permit-ready deliverables built to Hawaii DOH HAR 11-62 standards for the statewide 88,000 cesspool mandate.